
SpeedPost™ Advantages

Ready To Build The Same Day! This is one of the many
advantages of using the SpeedPost System™. There is no
digging or excavation, thus eliminating costly equipment
expenses and damage to surrounding landscape. Also, there is
no mess to clean up or soils to remove. Our SpeedPost
System™ is completely installed in 3 hours or less for most
projects. This allows for one inspection rather than
multiple inspections. Using the depth verification design,
the code official can easily verify depth by sliding a tape
measure down the center of the shaft, confirming the
footer’s location well below the frost line. Due to the
small, smooth surface-area of our post, frost-heave is
virtually eliminated; unlike concrete piers which have a
large, porous surface-area that allows frost to grip and
heave.

The SpeedPost System™ is eco-friendly and is often used in
environmentally-sensitive locations due to having no
vibration or invasive effects to its installation method.
The SpeedPost System™ is installed using compact,
specialized equipment. As the post is being installed, we
measure the torque resistance on the post which corresponds
to our engineered load chart. This allows the operator to
verify the load-capacity of each post installed. This is
superior to auguring a hole, which involves stopping at the
required depth by code and filling with concrete. With the
auguring method, there is also always the uncertainty of
whether or not the soil conditions will bear the load of
your project at the standard code depth.

SpeedPost™ has developed an extensive product line to meet
the needs of every type of project, as well as being
International Code Council compliant. The SpeedPost System™
can be built upon, immediately following its installation.
No more mixing and waiting for concrete to dry. We
understand that your time is money.
 |
|
SpeedPost
Advantages |
• Ready to build the same day
• Typical installations are 3 hours or less!
• Installed year-round (Frozen Ground, No Problem)
• No digging or excavation.
• No mixing or waiting for concrete to dry.
• No mess, No cleanup.
• Verifiable bearing-capacity per post. |
• Higher load-bearing capacity than traditional
methods.
• Better performance against frost-heave and
settlement.
• No soils to remove.
• No materials to pick up and transport for your
foundation.
• No equipment rentals.
• Easy-to-use post-to-wood brackets. |
 |
|
SpeedPost vs.
Concrete |
Take a look at this side by side
comparison and see why professionals and homeowners
alike choose SpeedPost.
 |
|
|
|
|
Materials
Needed |
|
Materials
Needed |
|
|
|
|
• SpeedPosts and Brackets |
|
• Spray paint to mark footings |
|
• Spray paint to mark footings |
|
• Nails/Screws |
| |
|
• Lumber for bracing |
| |
|
• Rebar (optional) |
| |
|
• Plastic formed footing (optional) |
| |
|
• Construction tube |
| |
|
• Bags of concrete or concrete truck |
| |
|
• Concrete to Post brackets |
|
|
|
|
Tools
Needed |
|
Tools
Needed |
|
|
|
|
• SpeedPost Torque-Master * Machine |
|
• Auguring machine or Backhoe |
|
• Band Saw |
|
• Shovels/Pick Axe |
|
• Level |
|
• Wheelbarrow |
| |
|
• Circular Saw or Hand Saw |
| |
|
• Level, Tape Measure, Square |
| |
|
• Hammer, Sledge, Pry Bar |
| |
|
• Powered Drill, Screw Driver |
|
|
|
|
Steps
Required to Complete Foundation |
|
Steps
Required to Complete Foundation |
|
|
|
|
• Mark footings |
|
• Mark and Dig Holes |
|
• Install SpeedPosts |
|
• Code Official to Inspect holes |
|
• Attach Brackets |
|
• Set Footings and Tubes |
| |
|
• Mix concrete fill tubes |
| |
|
• Wait for Concrete to Set |
|
|
|
|
Average
of 3 hours until ready to build |
|
Average
of 2-4 days until ready to build |
|
|
|
|
 |
|
|
To learn more about the features and benefits
SpeedPost™
has to offer, we invite you to
Visit Our Website |
|
or Contact Us
888-944-5032 |
|
SPNY@SpeedPostWorld.com |
|

|
|
|
|